TFH2-11-04
UN R134: Draft proposal for a Supplement to the 03 series of amendments
Downloads
UNECE server
Related documents
Proposal to amend Annex 3 para. 5.1. to specify that the CHSS test article shall include the container and primary closure devices such as shut-off valve(s), check valve(s), and TPRD required to isolate the system, container attachments including gas housings or barriers that could impede TPRD response, as well as supply lines for additional TPRDs through appropriate adaptors, and vent lines shall be connected to TPRDs to direct TPRD exhausts in a manner representative of the configuration in the vehicle.
Compressed Hydrogen Storage System
Thermally activated pressure relief device