Informal Group on GTR 9-Phase 2
19-20 Mar 2013 | Washington, DC
Agenda Item 6. Availability of drawing package and manual, process to review those data
Documentation
GTR9-05-04 Flex PLI GTR User Manual (Rev D)
GTR9-05-31 FlexPLI version GTR drawing package (zip compressed file)
GTR9-06-04 Mutual Resolution 1 guidelines for test tools
GTR9-06-05 Schedule for preparing an addendum to MR 1 for FlexPLI test tool
GTR9-06-06 FlexPLI GTR User Manual Rev. E 2013
GTR9-06-09 Review of FlexPLI drawing package and consistency check against hardware
GTR9-06-22 FlexPLI Drawing Review (surface level) Update
GTR9-06-23 FlexPLI Drawing Review
GTR9-06-23/Rev.1 FlexPLI Drawing Review (revised)