ADS-20-18/Rev.1
ADS: Clarification on crash causation
Downloads
UNECE server
Related documents
Proposal to clarify section 6.1.2.1 regarding crash causation. During approval process, when collisions involve the ADS during the manufacturer’s real-world or confirmatory testing, a root cause analysis is required and an explanation provided. Where the ADS is determined to have played a role in causation, the manufacturer will provide evidence of how related causal factors have been addressed in the final ADS prior to approval. Post-deployment collisions are covered by the ISMR process taking into account the applicable law of the country in which the collision occurred.