MS Excel download of the latest project schedule for development of the test procedures under WLTP.

UNECE server
Excerpts from session reports
WLTP-DTP | Session 10 | 6 Jun 2012

A draft revised roadmap has been presented by Ichikawa-san (doc. WLTP-DTP-10-04). Test execution of VP2 should be terminated until September at the latest, but evaluation shall be possible until December 2012. In order for them to incorporate the current schedule, the confirmation phase and the round robin test shall be combined.

A separate Validation Phase for RLD shall be executed until end of 2012.

DTP welcomes the prolonged evaluation phase and also endorses the fact that the milestone for finalization of WLTP will not be postponed.

The revised roadmap was approved by DTP.