1. Adoption of the agenda
2. RCB correction, Phase specific calculation
3. CO2 family for the combined approach
4. OIL #51: Mode-selectable switch
5. OIL #52 End of range criteria for PEV
6. OIL #58: Shorten test procedures for PEV
7. OIL #57: Utility factor
8. OIL #53: FCV test procedure
9. Drafting (reviewing items pointed by T&E and drafting coordinator)
10. Any other business