14 Jun 2018
|
GTR 13: draft text on hydrogen compatibility of materials
|
GTR13-03-05
|
2018-06-14 |
6 Mar 2019
|
Agenda for the 5th GTR13-Phase II informal group session
|
GTR13-05-01/Rev.3
|
2019-03-06 |
30 Jan 2019
|
Directions and map for the 5th GTR13-Phase II informal group session
|
GTR13-05-02
|
2019-01-30 |
21 Feb 2019
|
GTR 13: NHTSA final report on Hydrogen Container Performance Testing (NHTSA)
|
GTR13-05-03
|
2019-02-21 |
8 Mar 2019
|
GTR 13: Draft proposal for amendments to the scope with comments
|
GTR13-05-04/Rev.2
|
2019-03-08 |
|
Intentionally blank (GTR13-05-05 not available)
|
|
2019-02-21 |
22 Feb 2019
|
GTR 13: Current status and draft plan for round-robin validation testing (Japan)
|
GTR13-05-06
|
2019-02-22 |
26 Feb 2019
|
GTR13 informal group 5th session: Powertech dinner invitation
|
GTR13-05-07
|
2019-02-26 |
8 Mar 2019
|
GTR 13 Phase II general project schedule
|
GTR13-05-08/Rev.1
|
2019-03-08 |
4 Mar 2019
|
ISO/TC 197 (hydrogen fuel vehicle interoperability) status update (ISO)
|
GTR13-05-09
|
2019-03-04 |
4 Mar 2019
|
GTR 13 Task Force 4: JARI localized fire test (JARI)
|
GTR13-05-10
|
2019-03-04 |
7 Mar 2019
|
Task Force 5 ISO/TC 197 Recommendations (hydrogen fueling interoperability) (ISO)
|
GTR13-05-11/Rev.1
|
2019-03-07 |
4 Mar 2019
|
H2 Composite Pressure Vessel (CEA)
|
GTR13-05-12
|
2019-03-04 |
|
Intentionally blank (GTR13-05-13 not available)
|
|
2019-03-04 |
|
Intentionally blank (GTR13-05-14 not available)
|
|
2019-03-04 |
6 Mar 2019
|
GTR 13 Task Force 1 current status
|
GTR13-05-15/Rev.1
|
2019-03-06 |
5 Mar 2019
|
GTR 13: CSA technical committee updates-hydrogen and natural gas standards (CSA)
|
GTR13-05-16
|
2019-03-05 |
5 Mar 2019
|
GTR 13 Phase 2: NHTSA Updates (NHTSA)
|
GTR13-05-17
|
2019-03-05 |
6 Mar 2019
|
Information for the 6th GTR 13-Phase II informal group session (Tianjin, China)
|
GTR13-05-18
|
2019-03-06 |
|
Intentionally blank (GTR13-05-19 not available)
|
|
2019-03-06 |
6 Mar 2019
|
GTR 13: Engulfing and localised tests: further analysis (HySAFER-Ulster University)
|
GTR13-05-20
|
2019-03-06 |
6 Mar 2019
|
Comments on GTR 13 informal group documents (BAM)
|
GTR13-05-21
|
2019-03-06 |
6 Mar 2019
|
GTR 13: H2 Composite Pressure Vessel (CEA)
|
GTR13-05-22
|
2019-03-06 |
6 Mar 2019
|
GTR 13 Task Force 3 (Refueling) test procedures input
|
GTR13-05-23
|
2019-03-06 |
6 Mar 2019
|
GTR 13 Task Force 3 refueling points (Air Liquide)
|
GTR13-05-24
|
2019-03-06 |
7 Mar 2019
|
GTR 13 materials compatibility proposal
|
GTR13-05-25
|
2019-03-07 |
7 Mar 2019
|
GTR 13: H2 Composite Vessel- Additional slide (CEA)
|
GTR13-05-26
|
2019-03-07 |
7 May 2019
|
GTR 13 Phase 2 informal group 5th session meeting notes
|
GTR13-05-27
|
2019-05-07 |