| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Document title | Wiring concept for ACV (FACS) | ||||||||||
| Date | 27 Feb 2012 | ||||||||||
| Source(s) | Jost | ||||||||||
| Status | |||||||||||
| Rulemaking area(s) | |||||||||||
| Meeting(s) | |||||||||||
| Related documents | |||||||||||
| Downloads: | .pdf format | ||||||||||
| Excerpts from session reports related to this document | |||||||||||
| ACV | Session 6 | 28-29 Feb 2012 |
The various working documents submitted for this meeting were discussed in detail. For the outcome of the discussions, please see document ACV-06-10. Provisions for mismatching between 12/24 volt Measuring response time If volume L in annex 6 is left then we have a problem. A valve adds 0.06s. We need to change the volume in annex 6 for the automated system. If the connection line between truck and trailer is different then this must be taken into account. We actually need a longer length. The group agreed that the method as outlined still applies but there are open issues: Solid connection of hoses A point for the next meeting : think about a manual button that would make the driver leave his cab. |
||||||||||