1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
---|---|---|---|---|---|---|---|---|---|
Document Title | Wiring concept for ACV (FACS) | ||||||||
Reference Number | ACV-06-04 | ||||||||
Date |
25 Apr 2012
|
||||||||
Source(s) | Jost | ||||||||
Rulemaking Area(s) | Fully Automated Couplings | ||||||||
Meeting(s) | |||||||||
Downloads | |||||||||
UNECE server | .pdf format | ||||||||
Excerpts from session reports related to this document | |||||||||
ACV | Session 6 | 28-29 Feb 2012 |
The various working documents submitted for this meeting were discussed in detail. For the outcome of the discussions, please see document ACV-06-10. Provisions for mismatching between 12/24 volt Measuring response time If volume L in annex 6 is left then we have a problem. A valve adds 0.06s. We need to change the volume in annex 6 for the automated system. If the connection line between truck and trailer is different then this must be taken into account. We actually need a longer length. The group agreed that the method as outlined still applies but there are open issues: Solid connection of hoses A point for the next meeting : think about a manual button that would make the driver leave his cab. |
||||||||