Informal Group on GTR 9-Phase 2 | Session 6 | 19-20 Mar 2013
Washington, DC
Agenda Item
Annex B: List of Action Items

(Note: Modified wordings for open action items A-4-03 and A-5-08 are indicated in bold letters.)

IDOpen Action ItemResponsibilityDue
A-4-03Review of TEG FlexPLI thresholds / criteriaALL7th meeting
A-5-08Clarify the details on how to bring the amendment into the gtr 9 (discussion with GRSP chair and UNECE secretariat)Chair7th meeting
A-6-01Clarify, whether a solid model (3D model) is available / neededChair7th meeting
A-6-02Start 100 % check of one master legBASt7th meeting
A-6-03Review information (drawings and manual) provided by HumaneticsBASt, Cellbond, Concept, OICA, all7th meeting
A-6-04Update manual again under consideration of IG comments, if anyHumaneticsBefore the draft amendment is agreed in Geneva
A-6-05Deliver feedback on document GTR9-6-25Alliance, all7th meeting
A-6-06Provide information on the master leg tests to BAStall involved labs1st week of April
A-6-07Analyze data (A-6-06) and provide document on thisBASt1st week of June 2013
A-6-08Check information from logbooks and provide combined information on thisAll1st week of May 2013
A-6-09Review information on this (GTR9-6-07, GTR9-6-11, GTR9-6-21) to come to a conclusion on the rebound issueAll7th meeting
A-6-10Prepare a joint document explaining the different approaches to derive the impactor thresholdsBASt and JASIC1st week of May 2013
A-6-11Review the document (A-6-10) prepared by BASt and JASICNHTSA, all1 July 2013
A-6-12Provide the certification reports for the legform used in document GTR9-6-20, if possibleOICAASAP

(Note of the secretary: Following action item A-6-12, the requested information was provided before these draft minutes were shared. The information was already added to the records of this meeting as document GTR9-6-28 to assure that all information needed is available.)