WLTP-07-07
WLTP: Progress report on Annex 4 open issues
WLTP: Progress report on Annex 4 open issues
Progress report on wind tunnel method, on-board anemometry and wind speed, speed points, torque meter method, default road load parameters, warm up procedure, and road load family concept.
WLTP-07-08
WLTP: Progress report on Annex 4 open issues (updated to 22 May 2014)
WLTP: Progress report on Annex 4 open issues (updated to 22 May 2014)
Progress report on wind tunnel method, on-board anemometry and wind speed, torque meter method, default road load parameters, and road load family concept.