Volatile Particle Remover Calibration and Validation Procedures
This document describes the calibration and validation procedures for the VPR. Calibration of the VPR is to be performed at the point of manufacture and validation is to be performed at least at 6 month intervals for all instruments without automatic temperature sensors or at least at 12 month intervals if automatic temperature sensors are present. The calibration procedure must be repeated if the system ‘fails’ its validation procedure or the particle number measurement system is modified in any way.