|
12 Mar 2013
|
Draft agenda for the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-01
|
2013-03-12 |
|
19 Mar 2013
|
Revised draft agenda for the 6th GTR9-Phase 2 informal group session
|
GTR9-06-01/Rev.1
|
2013-03-19 |
|
3 Jun 2013
|
Draft minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02
|
2013-06-03 |
|
5 Jul 2013
|
Revised draft minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02/Rev.1
|
2013-07-05 |
|
10 Sep 2013
|
Final minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02/Rev.2
|
2013-09-10 |
|
12 Mar 2013
|
FlexPLI Testing: Propelling Accuracy (OICA)
|
GTR9-06-03
|
2013-03-12 |
|
12 Mar 2013
|
Mutual Resolution 1 guidelines for test tools
|
GTR9-06-04
|
2013-03-12 |
|
12 Mar 2013
|
Schedule for preparing an addendum to MR 1 for FlexPLI test tool
|
GTR9-06-05
|
2013-03-12 |
|
12 Mar 2013
|
FlexPLI GTR User Manual Rev. E 2013 (Humanetics)
|
GTR9-06-06
|
2013-03-12 |
|
12 Mar 2013
|
Proposal for a Definition of the FlexPLI Biofidelic Assessment Interval (BAI) (BASt)
|
GTR9-06-07
|
2013-03-12 |
|
12 Mar 2013
|
Derivation of Draft FlexPLI prototype impactor limits (BASt)
|
GTR9-06-08
|
2013-03-12 |
|
21 Mar 2013
|
Derivation of Draft FlexPLI prototype impactor limits (revised) (BASt)
|
GTR9-06-08/Rev.1
|
2013-03-21 |
|
12 Mar 2013
|
Review of FlexPLI drawing package and consistency check against hardware (BASt)
|
GTR9-06-09
|
2013-03-12 |
|
12 Mar 2013
|
FlexPLI Pre- and Post-Test Procedure (BASt)
|
GTR9-06-10
|
2013-03-12 |
|
14 Mar 2013
|
Consideration of the rebound phase in GTR 9 FlexPLI test procedure (JASIC)
|
GTR9-06-11
|
2013-03-14 |
|
14 Mar 2013
|
Validation of Pedestrian Safety Flex-GTR model (JASIC)
|
GTR9-06-12
|
2013-03-14 |
|
14 Mar 2013
|
Proposal for an amendment to GTR 9 to define "primary peference marks" (OICA)
|
GTR9-06-13
|
2013-03-14 |
|
14 Mar 2013
|
Pedestrian safety FlexPLI round robin testing (NHTSA)
|
GTR9-06-14
|
2013-03-14 |
|
14 Mar 2013
|
JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate (Alliance and JP Research)
|
GTR9-06-15
|
2013-03-14 |
|
17 Mar 2013
|
JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate: Revised (JP Research and Alliance)
|
GTR9-06-15/Rev.1
|
2013-03-17 |
|
14 Mar 2013
|
JP Research summary of its review of FlexPLI injury reduction estimates (JP Research)
|
GTR9-06-16
|
2013-03-14 |
|
17 Mar 2013
|
Pedestrian Protection: Large Truck/SUV Challenges (Alliance)
|
GTR9-06-17
|
2013-03-17 |
|
17 Mar 2013
|
Ford GTR09 US Vehicle Round Robin (Ford)
|
GTR9-06-18
|
2013-03-17 |
|
17 Mar 2013
|
Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin (Shape)
|
GTR9-06-19
|
2013-03-17 |
|
20 Mar 2013
|
Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin: Revision 1 (Shape)
|
GTR9-06-19/Rev.1
|
2013-03-20 |
|
16 Mar 2013
|
Discussion on Impactor Thresholds (OICA)
|
GTR9-06-20
|
2013-03-16 |
|
17 Mar 2013
|
Proposal on FlexPLI measuring results and Flex-PLI requirements of GTR9-PH2 (OICA)
|
GTR9-06-21
|
2013-03-17 |
|
17 Mar 2013
|
FlexPLI Drawing Review (surface level) Update (JASIC)
|
GTR9-06-22
|
2013-03-17 |
|
17 Mar 2013
|
FlexPLI Drawing Review (Cellbond)
|
GTR9-06-23
|
2013-03-17 |
|
21 Mar 2013
|
FlexPLI Drawing Review (revised) (Cellbond)
|
GTR9-06-23/Rev.1
|
2013-03-21 |
|
25 Jun 2013
|
Flex PLI drawing review (Cellbond)
|
GTR9-06-23/Rev.2
|
2013-06-25 |
|
19 Mar 2013
|
Durability Study FlexPLI SN03 at Bertrandt Laboratory (Bertrandt)
|
GTR9-06-24
|
2013-03-19 |
|
21 Mar 2013
|
Comments on document GTR9-06-15 (BASt)
|
GTR9-06-25
|
2013-03-21 |
|
21 Mar 2013
|
Injury Probability Functions for the Flexible Pedestrian Legform Impactor (SAE and JASIC)
|
GTR9-06-26
|
2013-03-21 |
|
21 Mar 2013
|
JASIC Comments on Alliance and JP Research Documents (JASIC)
|
GTR9-06-27
|
2013-03-21 |
|
25 Apr 2013
|
Certification test results of the OEM legform used in document GTR9-6-20 (OICA)
|
GTR9-06-28
|
2013-04-25 |