19-20 Mar 2013 | Washington, DC
Documentation
12 Mar 2013 Draft agenda for the 6th GTR 9-Phase 2 informal group session GTR9-06-01 2013-03-12
19 Mar 2013 Revised draft agenda for the 6th GTR9-Phase 2 informal group session GTR9-06-01/Rev.1 2013-03-19
3 Jun 2013 Draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02 2013-06-03
5 Jul 2013 Revised draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02/Rev.1 2013-07-05
10 Sep 2013 Final minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02/Rev.2 2013-09-10
12 Mar 2013 FlexPLI Testing: Propelling Accuracy (OICA) GTR9-06-03 2013-03-12
12 Mar 2013 Mutual Resolution 1 guidelines for test tools GTR9-06-04 2013-03-12
12 Mar 2013 Schedule for preparing an addendum to MR 1 for FlexPLI test tool GTR9-06-05 2013-03-12
12 Mar 2013 FlexPLI GTR User Manual Rev. E 2013 (Humanetics) GTR9-06-06 2013-03-12
12 Mar 2013 Proposal for a Definition of the FlexPLI Biofidelic Assessment Interval (BAI) (BASt) GTR9-06-07 2013-03-12
12 Mar 2013 Derivation of Draft FlexPLI prototype impactor limits (BASt) GTR9-06-08 2013-03-12
21 Mar 2013 Derivation of Draft FlexPLI prototype impactor limits (revised) (BASt) GTR9-06-08/Rev.1 2013-03-21
12 Mar 2013 Review of FlexPLI drawing package and consistency check against hardware (BASt) GTR9-06-09 2013-03-12
12 Mar 2013 FlexPLI Pre- and Post-Test Procedure (BASt) GTR9-06-10 2013-03-12
14 Mar 2013 Consideration of the rebound phase in GTR 9 FlexPLI test procedure (JASIC) GTR9-06-11 2013-03-14
14 Mar 2013 Validation of Pedestrian Safety Flex-GTR model (JASIC) GTR9-06-12 2013-03-14
14 Mar 2013 Proposal for an amendment to GTR 9 to define "primary peference marks" (OICA) GTR9-06-13 2013-03-14
14 Mar 2013 Pedestrian safety FlexPLI round robin testing (NHTSA) GTR9-06-14 2013-03-14
14 Mar 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate (Alliance and JP Research) GTR9-06-15 2013-03-14
17 Mar 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate: Revised (JP Research and Alliance) GTR9-06-15/Rev.1 2013-03-17
14 Mar 2013 JP Research summary of its review of FlexPLI injury reduction estimates (JP Research) GTR9-06-16 2013-03-14
17 Mar 2013 Pedestrian Protection: Large Truck/SUV Challenges (Alliance) GTR9-06-17 2013-03-17
17 Mar 2013 Ford GTR09 US Vehicle Round Robin (Ford) GTR9-06-18 2013-03-17
17 Mar 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin (Shape) GTR9-06-19 2013-03-17
20 Mar 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin: Revision 1 (Shape) GTR9-06-19/Rev.1 2013-03-20
16 Mar 2013 Discussion on Impactor Thresholds (OICA) GTR9-06-20 2013-03-16
17 Mar 2013 Proposal on FlexPLI measuring results and Flex-PLI requirements of GTR9-PH2 (OICA) GTR9-06-21 2013-03-17
17 Mar 2013 FlexPLI Drawing Review (surface level) Update (JASIC) GTR9-06-22 2013-03-17
17 Mar 2013 FlexPLI Drawing Review (Cellbond) GTR9-06-23 2013-03-17
21 Mar 2013 FlexPLI Drawing Review (revised) (Cellbond) GTR9-06-23/Rev.1 2013-03-21
25 Jun 2013 Flex PLI drawing review (Cellbond) GTR9-06-23/Rev.2 2013-06-25
19 Mar 2013 Durability Study FlexPLI SN03 at Bertrandt Laboratory (Bertrandt) GTR9-06-24 2013-03-19
21 Mar 2013 Comments on document GTR9-06-15 (BASt) GTR9-06-25 2013-03-21
21 Mar 2013 Injury Probability Functions for the Flexible Pedestrian Legform Impactor (SAE and JASIC) GTR9-06-26 2013-03-21
21 Mar 2013 JASIC Comments on Alliance and JP Research Documents (JASIC) GTR9-06-27 2013-03-21
25 Apr 2013 Certification test results of the OEM legform used in document GTR9-6-20 (OICA) GTR9-06-28 2013-04-25